![]() Transportation Infrastructure Management Division Project Delivery Section – Durham/York East Contacts Ministry of Transportation of Ontario design and Ministry of Transportation's rehabilitation of Highway 401 and replacement of bridge structures contracts. Report DS-22-52 - Mastaff update on the Lviv Blvd. 11 at 6 a.m.Įxcavation and installation of a structure and 900 mm storm sewer crossings across Simcoe St. Northbound traffic to be detoured at Bloor St. Southbound traffic to be detoured at First Ave. ![]() including the Highway 401 westbound on-ramp. Subscribe to Oshawa Road and Sidewalk closures to stay current on this and other road construction. will provide written notification to all stakeholders, a minimum of two (2) weeks in advance of any full closures. All closure setups will be done in accordance with Ontario Traffic Manual - Book 7 - Temporary Conditions. These closures are not concurrent and will be implemented during various stages of the project.įor the duration of the project, MTO has committed to notifying community members and businesses in advance of all roadway closures using variable message boards and appropriate signage. Highway 401 eastbound and westbound lanes (including the on-ramp via Drew St.) from Simcoe St.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |